Driveway renovation 2017


The driveway got its new roadbase gravel in May 2017, and since, the project was done by hand using a shovel and a rake and loads of wheelbarrow loads.  It took 3 days to do the whole driveway and to make new features to make the driveway separate from the yard.  Enjoy the pictures!



Thank you for viewing my pics on the new driveway.